我正在实施完整日历并努力解决时区问题。
这是代码:
$('#calendar').fullCalendar({ //re-initialize the calendar
header: h,
defaultView: 'agendaWeek', // change default view with available options from http://arshaw.com/fullcalendar/docs/views/Available_Views/
slotMinutes: 15,
editable: true,
lang: 'pl',
timezone: 'Europe/Warsaw',
droppable: true, // this allows things to be dropped onto the calendar !!!
drop: function(date, allDay) { // this function is called when something is dropped
// retrieve the dropped element's stored Event Object
var originalEventObject = $(this).data('eventObject');
// we need to copy it, so that multiple events don't have a reference to the same object
var copiedEventObject = $.extend({}, originalEventObject);
// assign it the date that was reported
copiedEventObject.start = date;
var endDate = new Date(date);
endDate.setMinutes(endDate.getMinutes() + 70);
copiedEventObject.end = endDate;
alert(date);
alert(endDate);
//copiedEventObject.allDay = allDay;
copiedEventObject.className = $(this).attr("data-class");
// render the event on the calendar
// the last `true` argument determines if the event "sticks" (http://arshaw.com/fullcalendar/docs/event_rendering/renderEvent/)
$('#calendar').fullCalendar('renderEvent', copiedEventObject, true);
// is the "remove after drop" checkbox checked?
if ($('#drop-remove').is(':checked')) {
// if so, remove the element from the "Draggable Events" list
$(this).remove();
}
},
});
如果我通过删除它来创建新事件,我得到的是 GMT 时区的日期时间,而我应该设置为 CET,请帮助如何纠正丢弃事件时区设置。
我也有类似的问题。将日历属性设置为时区:"无"**。否则,您需要在日期时间字符串中指定时区短代码。